CWC management currently uses thea job order costing system because each product, standard windows or custom windows, requires unique designsdesign. CostThe cost of products is determined by actual direct costs and overhead using a predetermined rate to the actual volume of the allocation base (normal costing). CWC allocates their overhead costs using the facility-wide rate, based on machine hours. Total costs for each product are accumulated using the job cost sheet. The product costs for each product fully absorb the manufacturing costs (absorption costing).

The text above was approved for publishing by the original author.

Previous       Next

無料の試し

メッセージをご記入ください
修正依頼の言語をご選択ください

チェックアウト私たちの Gmail 校正延長!

eAngel.me

eAngel.me is a human proofreading service that enables you to correct your texts by live professionals in minutes.