Hi Heather,

We had a meeting with Andy and Dave to define the plan
moving forward for the Eengineering Eenclosures.

There are three main tasks to complete this request:

1. Develop an
d engineering application for design registration with ABSA for a welded engineering enclosure design.

2. Get ABSA approval of RRIMR for bolted enclosures to be included in the PEIMP document
.

3. Add details of we
dlded enclosure to the RRIMR document indicated above.

I will work with Dave and Andy
ion the iItems 1 and 3. The first step is to create a draft and meet with ABSA at the end of March to define the path forward.

After receiving ABSA
's blessing we will start to work in the Eengineering calculations and design. Once approved by ABSA we will work on iItem 3.

To install bolted enclosures (Plidco style)
the, iItem 2 should be completed and given limitation on resources. wWe suggest that Hsao’s team to work on this item. Andy will mentor and review it.

. . . . . .

Wh
atich cost center do you want us to charge the time to?

The text above was approved for publishing by the original author.

Previous       Next

無料の試し

メッセージをご記入ください
修正依頼の言語をご選択ください

私たちの Word,PowerPoint専用校正アドイン!をお試しください。

eAngel.me

eAngel.me is a human proofreading service that enables you to correct your texts by live professionals in minutes.